Labor Force & Population

car icon

28 Minute

Drive Time

people icon

Population

95,000

construction worker icon

Labor Force

44,894

Jax MSA

Our residents lie within the Jacksonville MSA with 760,000+ working adults and over 1.6 million residents.

Military Connection

Nassau County is equidistant to four military bases

Veteran Power

Each yr. 3000 skilled veterans return to the private sector. Florida is a right to work state.

Crawford Diamond is a sustainability-focused industrial park in Nassau County FL, to be powered by 74.5 MW of FPL universal solar generation.

Transportation

road icon

Interstate 95

18 miles

Interstate 10 - 18 Miles

Jax - 18 Miles

US Highway 301 - 17 Miles

plane in circle icon

Jacksonville International Airport

14 Miles

train in circle icon

CSX and Norfolk Southern

10,000 feet of Dual Class 1 Rail frontage CSX and Norfolk Southern

port in circle icon

4 Deep Water Shipping Terminals

All within 32 Miles

Site Information

land icon

400 Acres

crane icon

Divisible

To Fit Project Needs

400 acres available for industrial use, with 1,300 acres currently designated for FPL solar generation.

Targeted Land Use

cogs icon

Manufacturing

people icon

Healthcare

network icon

Information
Technology

tractor icon

Agricultural

globe icon

Aviation
and Aerospace

power icon

Clean
Energy

briefcase icon

Finance and
Professional Services

satellite icon

Defense and
Homeland Security

Utility Assets

power icon

Electric

Florida Power & Light
74.5 MW solar installation on site. A230-kV transmission line supplies the onsite substation with capacity to serve 100 MW. FPL commercial.industrial electric rates are as much as 42% below the national average, and electricity reliability is 50% better than national average.
water2 icon

Water

Town of Callahan
The Town of Callahan can supply both process and potable water through the construction of an onsite water plant which is currently being implemented for a consumptive Use permit and well permit to accomadate.
sewer icon

Wastewater

Town of Callahan
The Town of Callahan is currently upgrading its wastewater treatment capacity at the site to serve up to 250,000 GPD with an 88″ forced main.
gas icon

Natural Gas

Florida Public Utilities
The 16″ line runs through the site parallel to Crawford Diamond and connects to US 301. A gate will need to be installed on the property to provide gas.
network icon

Fiber Optic

Windstream and Others
Windstream has a major trunk co-located along the NS rail line. Other fiber providers are located in the area.
train icon

Rail Provider

CSX, Norfolk Southern, and First Coast Railroad
Windstream has a major trunk co-located along the Norfolk Southern rail line.

Customers have seen a 41% reliability improvement since 2006. FPL has led the state for 16 of the last 17 years, and won the ReliabilityOne® National Reliability Award for the seventh time in eight years.