Our residents lie within the Jacksonville MSA with 760,000+ working adults and over 1.6 million residents.
Military Connection
Nassau County is equidistant to four military bases
Veteran Power
Each yr. 3000 skilled veterans return to the private sector. Florida is a right to work state.
Crawford Diamond is a sustainability-focused industrial park in Nassau County FL, to be powered by 74.5 MW of FPL universal solar generation.
Transportation
Interstate 95
18 miles
Interstate 10 - 18 Miles
Jax - 18 Miles
US Highway 301 - 17 Miles
Jacksonville International Airport
14 Miles
CSX and Norfolk Southern
10,000 feet of Dual Class 1 Rail frontage CSX and Norfolk Southern
4 Deep Water Shipping Terminals
All within 32 Miles
Site Information
400 Acres
Divisible
To Fit Project Needs
400 acres available for industrial use, with 1,300 acres currently designated for FPL solar generation.
Targeted Land Use
Manufacturing
Healthcare
Information Technology
Agricultural
Aviation and Aerospace
Clean
Energy
Finance and Professional Services
Defense and Homeland Security
Utility Assets
Electric
Florida Power & Light
74.5 MW solar installation on site. A230-kV transmission line supplies the onsite substation with capacity to serve 100 MW. FPL commercial.industrial electric rates are as much as 42% below the national average, and electricity reliability is 50% better than national average.
Water
Town of Callahan
The Town of Callahan can supply both process and potable water through the construction of an onsite water plant which is currently being implemented for a consumptive Use permit and well permit to accomadate.
Wastewater
Town of Callahan
The Town of Callahan is currently upgrading its wastewater treatment capacity at the site to serve up to 250,000 GPD with an 88″ forced main.
Natural Gas
Florida Public Utilities
The 16″ line runs through the site parallel to Crawford Diamond and connects to US 301. A gate will need to be installed on the property to provide gas.
Fiber Optic
Windstream and Others
Windstream has a major trunk co-located along the NS rail line. Other fiber providers are located in the area.
Rail Provider
CSX, Norfolk Southern, and First Coast Railroad
Windstream has a major trunk co-located along the Norfolk Southern rail line.
Customers have seen a 41% reliability improvement since 2006. FPL has led the state for 16 of the last 17 years, and won the ReliabilityOne® National Reliability Award for the seventh time in eight years.